Division 8 Table of Contents
Section 8010 - Traffic Signals
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Underground
2.02 Detection
2.03 Communications
2.04 Cabinet and Controller
2.05 Poles, Heads, and Signs
Part 3 - Execution
3.01 Underground
3.02 Detection
3.03 Communications
3.04 Cabinet and Controller
3.05 Poles, Heads, and Signs
3.06 Temporary Traffic Signal
3.07 Surface Restoration
3.08 Testing
3.09 Documentation
Figures
8010.101 Cabinet Footing Details
8010.102 Traffic Signal Pole Foundation
8010.103 Conduit and Precast Handholes
8010.104 Inductive Loop Vehicle Detectors
8010.105 Mast Arm Pole Details
8010.106 Pedestal Pole and Pedestrian Post Details
8010.107 Wood Post Span Assembly
Section 8020 - Pavement Markings
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Materials
Part 3 - Execution
3.01 Equipment
3.02 Construction