| Benton |
BRF -218-6(45)--38-06 |
U.S. 218 |
U.S. 218, over Pratt Creek 0.7 mile south of Iowa 8 (one project) |
Bridge replacement |
$1,048,906.97 |
Taylor Construction, New Vienna |
2/17/2009 |
| Buchanan |
BRF-150-3(58)--38-10 |
Iowa 150 |
Iowa 150, over Bear Creek 3.3 miles south of Independence (one project) |
Bridge replacement |
$983,635.04 |
Taylor Construction, New Vienna |
2/17/2009 |
| Buena Vista |
ESP-003-2(53)--2S-11 |
Iowa 3 |
Iowa 3 over Brooke Creek 6.1 miles west of U.S. 71 |
Bridge Replacement-CCS |
$782,441.41 |
Godbersen-Smith Construction Co., Ida Grove, Iowa |
7/21/2009 |
| Calhoun |
STP-007-4(17)--2C-13 |
Iowa 7 |
Iowa 7, from 0.5 mile west of Calhoun County line east to U.S. 169 |
Hot-mix asphalt (HMA) resurfacing |
$5,366,999.01 |
Fort Dodge Asphalt Co., Fort Dodge, Iowa |
3/17/2009 |
| Calhoun |
ESP-020-3(83)—2S-13 |
U.S. 20 |
U.S. 20 from the Sac County line east to Calhoun County Road N-33 (one project) |
Grading |
$3,060,494.75 |
C.J. Moyna and Sons Inc., Elkader, Iowa |
2/16/2010 |
| Carroll |
ESP-071-5(68)--2S-14 |
U.S. 71 |
From 1 Mile N. Of Carroll N. To E. Jct. Ia. 175 In Auburn |
HMA Resurfacing with Milling |
$1,423,249.45 |
OMG Midwest Inc., DBA Tri-State Paving Company, Estherville, Iowa |
3/31/2009 |
| Chickasaw |
STP-024-1(17)--2C-19; STP-024-1(20)--2C-19 |
Iowa 24 |
Iowa 24, Tied projects: (1) From the east city limit of New Hampton east to the west junction of Chickasaw County Road V-56 in Lawler; and (2) From east city limit of Lawler east to Winneshiek County Road V-68 in Jackson Junction |
(1) HMA resurfacing/Cold-in-Place (CIP) recycling; and (2) HMA resurfacing with milling |
$5,767,117.30 |
Mathy Construction Co., Onalaska, Wis. |
3/17/2009 |
| Clarke |
IMX-035-1(111)24 -- 02-20 |
I-35 |
I-35, from the Decatur County line north to U.S. 34 (southbound lanes) |
Portland cement concrete (PCC) pavement - replace |
$15,304,218.90 |
Manatts Inc., Brooklyn, Iowa |
3/17/2009 |
| Clarke |
ESIMX-035-1(112)24--1S-20 |
I-35 |
I-35 from the Decatur County line north to U.S. 34 (northbound lanes) |
PCC Pavement - Replace (Tied to a non-ARRA
project #IMN-035-1(120)--0E-20) |
$14,355,527.09 |
Flynn Co. Inc., Dubuque, Iowa |
7/21/2009 |
| Clarke |
BRFIMX-035-1(105)33--14-20; BRFIMX-035-1(116)33--14-20 |
I-35 and U.S. 34 |
I-35/U.S. 34, interchange west of Osceola (two tied projects) |
Bridge replacement, grading and Portland cement concrete pavement |
$3,362,499.90 |
Herberger Construction, Indianola |
2/17/2009 |
| Clayton |
ESP-052-3(31)--2S-22 and
ESP-052(32)--2S-22 |
U.S 52 |
Overall project was divided into two tied sections: (1) From just south of the north city limit of Garnavillo north to just south of Iowa 13; and
(2) from just south of the north city limit of Guttenberg north to just north of the south city limit of Garnavillo |
HMA Resurfacing |
$7,186,267.25 |
Mathy Construction Co., Onalaska, Wisconsin |
7/21/2009 |
| Davis |
ESP-002-8(35)--2S-26 |
Iowa 2 |
Iowa 2 from the west junction of U.S. 63 east to the east junction of U.S. 63 |
HMA Resurfacing |
$3,412,074.28 |
Norris Asphalt Paving Co., Ottumwa, Iowa |
6/16/2009 |
| Decatur |
STP-069-1(38)--2C-27 |
U.S. 69 |
U.S. 69, from just north of I-35 north to the south city limit of Osceola |
HMA resurfacing/HMA pavement widening |
$5,037,811.40 |
Norris Asphalt Paving Co., Ottumwa, Iowa |
3/17/2009 |
| Fremont |
IMX-029-1(68) 20--02 -36; IMX-029-1(69) 20--02 -36; IMX-029-1(75) 16--02 -36 |
I-29 |
I-29, over Plum Creek 0.5 mile south of Fremont Co. Rd. J-24 (includes two bridges and paving of the northbound and southbound lanes); I-29, over Fremont Co. Rd. J-24 (includes two bridges and paving of the northbound and southbound lanes); I-29, from 1.5 mile north of Fremont Co. Rd. J-26, north to 1.5 mile north of Co. Rd. J-24 (concrete overlay of northbound lanes and hot-mix asphalt resurfacing of southbound lanes) (three tied projects) |
Bridge replacements and pavement overlays |
$16,161,263.30 |
Godberson-Smith Construction Co., Ida Grove |
2/17/2009 |
| Harrison |
ESIMX-029-5(100)95--1S-43 |
I-29 |
From just south of Co. Rd. F-20 In Harrison Co. N. To just north of Ia. 175(NBL/SBL) |
PCC Pavement - Grade and Replace |
$42,253,361.80 |
McCarthy Improvement Company and Affiliates DBA McCarthy Improvement Company, Davenport, Iowa |
3/31/2009 |
| Lee |
NHSX-061-1(122) --3H-56 |
U.S. 61 |
U.S. 61, at one location on U.S. 61 (Fort Madison bypass), just north of the Iowa 2 interchange (one project) |
Reinforced concrete box culvert |
$126,319.49 |
Iowa Bridge and Culvert, Washington |
2/17/2009 |
| Lee |
NHSX-061-1(165) --3H-56 |
U.S. 61 |
U.S. 61, at one location on U.S. 61 (Fort Madison bypass), just south of Bluff Road (one project) |
Reinforced concrete box culvert |
$299,530.10 |
Bloomfield Bridge and Culvert Inc., Bloomfield |
2/17/2009 |
| Lee |
NHSX-061-1(124) --3H-56 |
U.S. 61 |
U.S. 61, Fort Madison bypass from Iowa 2 northeast to south of Chalk Ridge Road (one project) |
Grading |
$8,245,239.72 |
PCI, Reinbeck |
2/17/2009 |
| Lee |
NHSX-061-1(129) --3H-56; NHSX-061-1(132) --3H-56; NHSX-061-1(162) --3H-56 |
U.S. 61 |
U.S. 61, at one location on U.S. 61 (Fort Madison bypass) at the Lee Co. Rd. J-40 interchange; U.S. 61, Fort Madison bypass from Lee Co. Rd. J-40 east to just east of Lee Co. Rd. X-32; and U.S. 61, at one location on Lee Co. Rd. X-32, just north of the interchange of Lee Co. Rd. X-32 and U.S. 61 (Fort Madison Bypass) (three tied projects) |
Reinforced concrete box culverts and grading |
$6,071,927.48 |
Steger Construction Inc., Dyersville |
2/17/2009 |
| Mahaska |
ESP-063-3(78)--2S-62 |
U.S. 63 |
U.S. 63 from just south of 210th Street north to the east city limit of New Sharon |
HMA Pavement Widening/HMA Resurfacing |
$7,439,627.37 |
Norris Asphalt Paving Co., Ottumwa, Iowa |
6/30/2009 |
| Mills |
IMX-029-2(54) 42--02-65; IMX-029-2(65) 38--02-65 |
I-29 |
I-29, southbound and northbound over Saint Mary’s Creek, 0.9 miles south of Iowa 370; and I-29, from 3 miles north of the north junction of U.S. 34 north to the Pottawattamie County line (Includes two bridges and overlays of the northbound lanes and southbound lanes) (two tied projects) |
Bridge replacements and pavement overlays |
$13,468,383.02 |
Western Engineering Inc., Harlan |
2/17/2009 |
| Monona |
ESIMX-029-6(167)112--1S-67 |
I-29 |
I-29 from just north of Iowa 175 north to the Woodbury County line (northbound and southbound lanes) |
HMA Resurfacing |
$22,579,042.17 |
Western Engineering Inc., Harlan, Iowa |
6/16/2009 |
| Monona |
STP-141-2(41)--2C-67 |
Iowa 141 |
Iowa 141, from west of the Woodbury County line southeast to 6 km west of Mapleton (snow borrow) |
Grading |
$2,271,716.94 |
Peterson Contractors Inc., Reinbeck, Iowa |
3/17/2009 |
| Monona |
IMX-029-6(182) 124--02-67 |
I-29 |
I-29, southbound over Robinson Ditch, 3.1 miles south of the Woodbury County line (one project) |
Bridge replacement |
$1,169,819.30 |
Dixon Construction, Correctionville |
2/17/2009 |
| Osceola |
STP-009-2(21)--2C-72 |
Iowa 9 |
Iowa 9, from east of relocated Iowa 60 east to west of the east junction of Osceola County Road L-58 |
PCC overlay – unbonded |
$4,865,289.44 |
Flynn Company Inc., Dubuque, Iowa |
3/17/2009 |
| Page |
STP-002-2(44)-- 2C -73 |
Iowa 2 |
Iowa 2, in Clarinda from west of State Street east to the west junction of U.S. 71 |
HMA pavement widening/HMA resurfacing |
$848,816.55 |
Henningsen Construction Inc., Atlantic, Iowa |
3/17/2009 |
| Page |
NHSX-071-1(30) --3H-73 |
U.S. 71 |
U.S. 71, from the east junction of Iowa 2 in Clarinda north to U.S. 34 |
HMA pavement widening/HMA resurfacing |
$6,189,082.16 |
Henningsen Construction Inc., Atlantic, Iowa |
3/17/2009 |
| Plymouth |
BRF-003-1(75) --38-75 |
Iowa 3 |
Iowa 3, over Big Sioux River north of Westfield (one project) |
Border bridge replacement |
$1,842,960.80 (Iowa's Share) |
Dixon Construction, Correctionville |
2/17/2009 |
| Potta wattamie |
BRF-092 -1(59) --38-78 |
Iowa 92 |
Iowa 92, over Keg Creek 2.7 miles west of Treynor (one project) |
Bridge and approaches |
$1,142.159.06 |
Hawkins Construction, Omaha, Neb. |
2/17/2009 |
| Potta wattamie |
BRF-092-1(60) --38-78 |
Iowa 92 |
Iowa 92, over Middle Silver Creek 0.1 miles west of Treynor (one project) |
Bridge and approaches |
$1,279,850.30 |
Hawkins Construction, Omaha, Neb. |
2/17/2009 |
| Ringgold |
ESP-169-1(38)--2S-80 |
U.S. 169 |
U.S. 169 from Mount Ayr north to the Union County line - Tied with the Union County project |
HMA Pavement Widening/HMA Resurfacing |
$7,755,742.42 |
Henningsen Construction Inc., Atlantic, Iowa |
6/30/2009 |
| Ringgold |
ESP-002-4(43)--2S-80 |
Iowa 2 |
From north city limit of Kellerton east to I-35 |
HMA Resurfacing with Milling |
$3,822,452.48 |
Norris Asphalt Paving Co. |
10/19/2010 |
| Tama |
ESP-030-6(151)--2S-86 |
U.S. 30 |
U.S. 30 from east of Tama/Toledo east to the Benton County line |
HMA Resurfacing with Milling |
$4,105,922.22 |
Manatt's Inc, Brooklyn, Iowa |
6/16/2009 |
| Union |
ESP-169-2(21)--2S-88 |
U.S. 169 |
U.S. 169 from the Ringgold County line north to Afton - Tied to the Ringgold County project |
HMA Pavement Widening/HMA Resurfacing |
|
|
6/30/2009 |
| Wapello |
STP-016-1(17)--2C-90; STP-016-1(18)--2C-90 |
Iowa 16 |
Iowa 16 - Tied projects: (1) From Eldon north to former U.S. 34; and (2) From Eldon east to Selma |
(1) HMA resurfacing/CIP recycling; and (2) HMA resurfacing with milling |
$3,292,170.80 |
Norris Asphalt Paving Co., Ottumwa, Iowa |
3/17/2009 |
| Warren |
ESIMX-035-2(337)43--1S-91 |
I-35 |
From Clarke Co. Line N. To Co. Rd. G-14 S. Of Cumming (NBL)/SBL) |
HMA Resurfacing with Milling |
$18,607,987.34 |
Henningsen Construction Inc., Atlantic, Iowa |
3/31/2009 |
|
|
|
|
|
Total: $240,929,906.01 |
|
|