PHOTO ALBUM LISTING  

 

Pier Column Construction and Form Work  10-18-2000
Column reinforcing cage after partial assembly on the ground. Dump truck receiving assistance from a D4 dozer and a trackhoe to climb the east access road.
Pier column forms during their assembly on the ground. Construction for the east access road is underway.
Column forms being installed over the reinforcing cage. Pier 1 excavation after slope protection piles have been driven.
Drilled shaft overview from Pier 2 scaffolding. Looking down at Pier 2 column reinforcing from scaffolding.
Concrete placement at Pier 2. Looking up from inside of the column forms.
Pier 2 in background after form removal.
IDOT
Copyright 2000 - 2003, Iowa Department of Transportation. All Rights Reserved.
Web site developed by HNTB Technology Group. HNTB