Column reinforcing cage after partial assembly on the ground. |
| Dump truck receiving assistance from a D4 dozer and a trackhoe to climb the east access road. |
 |
Pier column forms during their assembly on the ground. |
| Construction for the east access road is underway. |
 |
Column forms being installed over the reinforcing cage. |
| Pier 1 excavation after slope protection piles have been driven. |
 |
Drilled shaft overview from Pier 2 scaffolding. |
| Looking down at Pier 2 column reinforcing from scaffolding. |
 |
Concrete placement at Pier 2. |
| Looking up from inside of the column forms. |
 |
Pier 2 in background after form removal. |