Closeup shot of East side of project. |
| Looking West at project overview. |
 |
Looking East at the East slope protection silt fence and straw mesh. |
| Pier 3 cofferdam excavation. The contractor is using a sharpened H-pile section to loosen the soil prior to excavation. |
 |
Deer on the site on September 19. This photo was taken within 50' of pile driving operations at Pier 2 (during a break in the pile driving). |
| Cutting off piles in Pier 2 footing. |
 |
Looking East at project overview. |
| Visitors observing the PDA testing. |
 |
Silt collected at the East side silt basin after 0.5 |
| Pier 3 cofferdam excavation. The contractor is using a sharpened H-pile section to loosen the soil prior to excavation. |
 |
Looking north along the new access road grading. |