Winter Site Conditions, Emergency Erosion Control  03-20-2001
Looking west toward Pier 2 prior to the removal of the capbeam form. Looking east toward Pier 6 during the installation of slope protection piles.
Looking west at Pier 2 capbeam form removal. Looking east at Pier 2 capbeam after steel form removal - wood bevel forms in place.
Silt fences below east side silt basin. Silt fences below east side silt basin.
Runoff water collecting on Pier 4 workpad. Pier 4 cofferdam installation underway.
Looking east at Pier 2 after form removal is complete. Pier 3 north shaft during overpour concrete removal.
Seeping water at Pier 6 slope protection piles. Cutting trench across east side access road to divert runoff water.
Cutting trench across east side access road to divert runoff water. Removal of ice and snow prior to installing straw bales below east side silt basin.
Water bypassing silt fence below east side silt basin (right center of photo). Straw bales in place below east side silt basin.
Repair of silt fence and addition of straw bales at Pier 4 workpad. Straw bales surrounding launching pit drainage inlets.