Looking west toward Pier 2 prior to the removal of the capbeam form. |
| Looking east toward Pier 6 during the installation of slope protection piles. |
 |
Looking west at Pier 2 capbeam form removal. |
| Looking east at Pier 2 capbeam after steel form removal - wood bevel forms in place. |
 |
Silt fences below east side silt basin. |
| Silt fences below east side silt basin. |
 |
Runoff water collecting on Pier 4 workpad. |
| Pier 4 cofferdam installation underway. |
 |
Looking east at Pier 2 after form removal is complete. |
| Pier 3 north shaft during overpour concrete removal. |
 |
Seeping water at Pier 6 slope protection piles. |
| Cutting trench across east side access road to divert runoff water. |
 |
Cutting trench across east side access road to divert runoff water. |
| Removal of ice and snow prior to installing straw bales below east side silt basin. |
 |
Water bypassing silt fence below east side silt basin (right center of photo). |
| Straw bales in place below east side silt basin. |
 |
Repair of silt fence and addition of straw bales at Pier 4 workpad. |
| Straw bales surrounding launching pit drainage inlets. |