Cap Beam and Drill Shaft Construction  02-12-2001
Pier 2 capbeam reinforcing - looking north inside of capbeam forms. Installation of capbeam anchor bolt wells.
Looking down at Pier 2 capbeam during final preparations. Crosshole Sonic Logging test being performed on Pier 3 north shaft.
Pier 2 capbeam during concrete placement. Looking east at project overview from the approximate location of the west abutment.
Pier 6 slope protection piles - a few of the piles have apparently hit an underground obstruction. Diver entering Pier 3 south shaft after core barrel removal to define location and quantity of water flow.