Footing forms in place prior to rebar. |
| Template in place to hold vertical column reinforcing for Pier 2 footing. |
 |
First concrete pour - September 29, 2000. |
| Concrete placement inside of column reinforcing. |
 |
Assembling the drilled shaft reinforcing steel cage. |
| Welding pile splices in Pier 2 footing. |
 |
Footing forms with horizontal bars in place. |
| Drill rig to be used for Piers 3 and 4 drilled shafts. |
 |
Vibration of Pier 2 footing concrete. |
| Small trackhoe inside Pier 3 cofferdam. |