Pier 2 footing after the concrete forms were removed. |
| Spinning soil from the drilled shaft auger at Pier 3. |
 |
Looking East at project overview. |
| Welded adjustment bolts used to align casings prior to welding. |
 |
Hand held thermometers used to monitor mass concrete internal and external temperatures. |
| Spraying hydroseed on exposed soil along new access road. Hydroseed consists of seed, ground paper or wood fiber and water. The mixture is sprayed on and forms a crusty coating that anchors the soil until the seed can germinate. |
 |
Augering material from Pier 3 drilled shaft prior to installing the casing. |
| Looking down from drill rig at Pier 3 casings. |