Cooperation between DOT environmental staff and the contractor to determine trees to be cut. Pink paint indicates trees to be left, orange paint indicates trees to be removed. |
| 8/28/00 |
 |
Aggressive erosion control measures on the freshly cleared west valley slope. |
| Silt basin channels are lined with cable-concrete over fabric to prevent erosion. |
 |
Installation of the cable-concrete panels to prevent erosion. |
| Silt fence installed to contain erosion along river. Trees that are to be left are marked with pink paint and pink ribbons. |
 |
An east-to-west view across the eventual bridge location. |
| Silt basin channel lined with cable-concrete at the west end of the bridge. |
 |
Newly planted grass begins to line the silt basin channel. |
| West-to-east view from the eventual western bridge terminus. |