Looking up at Pier 2 capbeam forms. |
| Video monitor/recorder used for drilled shaft inspection. |
 |
Video monitor/recorder used for drilled shaft inspection. |
| Ahmad Abu-Hawash of the Iowa DOT on top of Pier 2 capbeam forms. |
 |
Norm McDonald of the Iowa DOT on top of Pier 2 capbeam forms. |
| Looking north at Pier 2 capbeam forms. |
 |
Tremie bell used to seal tremie prior to insertion into the drilled shaft. |
| Pier 3 drilled shaft cage during lifting. |
 |
Pier 5 slope protection piles - a few piles have hit buried rocks and have gone offline. |
| Drilled shaft with eight broken #11 bars at lower left. |
 |
Pier 3 drilled shaft concrete after placement - note the spliced #11 bars at lower left. |