I-380 Improvement Project

Corridor facts

ANNUAL DAILY TRAFFIC COUNTS
I-380 corridor (U.S. 20 to River Forest Road)
2012 projections 31,800; 16 percent trucks
2032 projections 49,600; 20 percent trucks
Interchanges along I-380 corridor (2010)
U.S. 20 east interchange 15,200
Black Hawk County Road V-49 27,600
Evansdale Drive 29,200
River Forest Road 33,300
U.S. 20/218 west interchange 40,300
This section of I-380 was constructed in 1984.

The pavement is deteriorating at the joints, necessitating the reconstruction project.

In the past, partial-depth hot-mix asphalt patching and some full-depth concrete patching has allowed traffic to continue to flow.