Segment 2: Downtown Corridor
The Segment 2 study area is the downtown portion of I-29 in Sioux City. The project area begins approximately one-quarter mile south of the Burlington Northern Santa Fe (BNSF) railroad bridge over the Missouri River and ends west of the Hamilton Boulevard interchange. The project area encompasses the existing Floyd Boulevard, Pierce Street, Nebraska Street, U.S. 77/Wesley Parkway and Hamilton Boulevard interchanges, as well as several local street connections.Proposed improvements to Segment 2 are more extensive than the other segments and will include upgrading mainline I-29 from four lanes to six lanes, as well as upgrading several of the interchanges within the study area.
An environmental impact statement (EIS) study is currently underway for the I-29 downtown corridor. A draft and final EIS, as well as a record of decision, will document the results of this study. Timing of improvements within this segment will be dependent on funding availability and staging of improvements among the other segments of I-29.
Segment 2 - Alternative Plan A (pdf 1.3 MB) Segment 2 - Alternative Plan B (pdf 1.3 MB) Segment 2 - Alternative Plan C (pdf 6 MB)
Alternative A - animation
(22.5 MB - may take several minutes to open)
Alternative B - animation
(22.5 MB - may take several minutes to open)
Segment 2 - Alternative Plan B Design Variation (pdf 3.3 MB) - Alternative B currently incorporates design variations as a result of public input. These design variations are being discussed with the city.