35th St./31st St./28th St.


Project Description:
31st St.
  The 31st St. interchange will be reconstructed and a new bridge will be built over I-235.
A new eastbound exit ramp will be built at 31st St. to replace the existing exit ramp at 35th St.
   
28th St. & 35th St.
  28th St. and 35th St. bridges will be reconstructed. The streets will close at I-235 while the bridges are under construction. 28th and 35th streets will not be closed at the same time that 31st St. is closed.
   
Project Schedule: March - Dec. 2005

Traffic Impacts:
The bridge and ramps at 31st St., and 35th and 28th streets will be closed at various times during construction.

   