2004 PROJECTS

 

Mainline paving - WDM

63rd St/IA 28 interchange

42nd St/35th St/ median work

Keo Way interchange

5th/6th/7th interchanges

E. 14th/E. 15th interchanges

E. University bridges/roadway


A Guide to 2004 Construction Projects

2004 I-235 project map West mainline paving project 63rd St. project 42nd/35th/median project 5th/6th/7th project Keo Way project E 14th/E 15th project E Univ. project

Mainline paving in WDM
Mainline traffic lanes from the west I-80/35 interchange to the 8th St. interchange will be rebuilt.
63rd St. interchange
The interchange will be reconstructed from approximately July 2004 through the summer of 2005.
42nd St./35th St./Median work
The 42nd St. interchange and 35th St. under the freeway will be reconstructed. Median work from Cummins Pkwy. to 35th St. will take place.
5th/6th/7th streets
The interchanges will be reconstructed and new bridges built.

East 14th /E. 15th St.
The E. 14th St. interchange will be reconstructed. A new ramp bridge will be built over E. 15th St.

University Ave.
New bridges will be built over E. Univ. and the UP RR tracks. WB traffic on I-235 will be shifted to the new roadway.
Keo Way
The interchange will be reconstructed. A new ramp bridge will be built and exit and entrance ramps reconstructed.
   