Division 7 Table of Contents

 

Section 7010 - Portland Cement Concrete Pavement

 

Part 1 - General

 

1.01 Section Includes

 

1.02 Description of Work

 

1.03 Submittals

 

1.04 Substitutions

 

1.05 Delivery, Storage, Handling, and Salvaging

 

1.06 Scheduling and Conflicts

 

1.07 Special Requirements

 

1.08 Measurement and Payment

 

Part 2 - Products

 

2.01 Materials

 

2.02 Concrete Mixes

 

2.03 PCC Overlays

 

Part 3 - Execution

 

3.01 Equipment

 

3.02 Pavement Construction

 

3.03 Curb and Gutter Construction

 

3.04 Overlay Construction

 

3.05 Pavement Protection

 

3.06 Use of Pavement

 

3.07 Transportation Restrictions

 

3.08 Quality Control

 

Figures

 

7010.101 Joints

 

7010.102 PCC Curb Details

 

7010.103 Manhole Boxouts in PCC Pavement

 

7010.104 Ramped Median Nose

 

7010.901 PCC Pavement Jointing

 

7010.902 PCC Pavement Widening

 

7010.903 PCC Railroad Crossing Approach

 

7010.904 Typical Jointing Layout

 

7010.905 PCC Cul-de-sac Joint Locations

 

7010.906 Medians

 

Section 7020 - Hot Mix Asphalt Pavement

 

Part 1 - General

 

1.01 Section Includes

 

1.02 Description of Work

 

1.03 Submittals

 

1.04 Substitutions

 

1.05 Delivery, Storage, Handling, and Salvaging

 

1.06 Scheduling and Conflicts

 

1.07 Special Requirements

 

1.08 Measurement and Payment

 

Part 2 - Products

 

2.01 HMA Materials

 

2.02 Warm Mix Asphalt Materials

 

2.03 Recycled Asphalt Materials

 

2.04 Subgrade and Subbase

 

Part 3 - Execution

 

3.01 HMA Pavement

 

3.02 Base Widening

 

3.03 Protection from Traffic

 

3.04 Defects or Deficiencies

 

3.05 Pavement Smoothness

 

3.06 Quality Control

 

3.07 Removal of Pavement

 

Figures

 

7020.201 Manhole Boxouts in HMA Pavement and HMA Overlays

 

7020.901 HMA Pavement

 

7020.902 HMA Railroad Crossing Approach

 

7020.903 Details for Asphalt Resurfacing

 

Section 7030 - Sidewalks, Shared Use Paths, and Driveways

 

Part 1 - General

 

1.01 Section Includes

 

1.02 Description of Work

 

1.03 Submittals

 

1.04 Substitutions

 

1.05 Delivery, Storage, and Handling

 

1.06 Scheduling and Conflicts

 

1.07 Special Requirements

 

1.08 Measurement and Payment

 

Part 2 - Products

 

2.01 Portland Cement Concrete

 

2.02 Hot Mix Asphalt

 

2.03 Brick Pavers

 

2.04 HMA Setting Bed for Brick

 

2.05 Neoprene Modified Asphalt Adhesive for Brick

 

2.06 Brick Joint Filler

 

2.07 Detectable Warnings

 

2.08 Granular Driveway Surfacing

 

2.09 Isolation and Expansion Joint Sealant

 

Part 3 - Execution

 

3.01 Removals

 

3.02 Subgrade Preparation

 

3.03 Adjustment of Fixtures

 

3.04 PCC Sidewalks, Shared Use Paths, and Driveways

 

3.05 HMA Shared Use Paths and Driveways

 

3.06 Brick Sidewalks

 

3.07 Detectable Warning Installation

 

3.08 Tolerances for Shared Use Paths and Driveways

 

3.09 Granular Driveway Surfacing

 

3.10 Cleaning

 

3.11 Testing

 

3.12 Sidewalk and Curb Ramp Compliance

 

Figures

 

7030.101 Concrete Driveway, Type A

 

7030.102 Concrete Driveway, Type B

 

7030.103 Driveway Grading

 

7030.104 Right-of-way Grading

 

7030.201 Classes of Sidewalks

 

7030.202 Curb Details for Class A Sidewalk

 

7030.203 Brick Sidewalk

 

7030.204 General Features of an Accessible Sidewalk

 

7030.205 General Sidewalk and Curb Ramp Details

 

7030.206 Curb Ramps Outside of Intersection Radius

 

7030.207 Curb Ramp for Class B or C Sidewalk

 

7030.208 Alternative Curb Ramp for Class B or C Sidewalk

 

7030.209 Curb Ramps for Class A Sidewalk

 

7030.210 Detectable Warning Placement

 

Section 7040 - Pavement Rehabilitation

 

Part 1 - General

 

1.01 Section Includes

 

1.02 Description of Work

 

1.03 Submittals

 

1.04 Substitutions

 

1.05 Delivery, Storage, Handling, and Salvaging

 

1.06 Scheduling and Conflicts

 

1.07 Special Requirements

 

1.08 Measurement and Payment

 

Part 2 - Products

 

2.01 Materials

 

Part 3 - Execution

 

3.01 General

 

3.02 Full Depth Patching

 

3.03 Partial Depth Patching

 

3.04 Diamond Grinding

 

3.05 Milling

 

3.06 Crack and Joint Cleaning and Filling, Hot Pour

 

3.07 Crack Cleaning and Filling, Emulsion

 

3.08 Pavement Removal

 

3.09 Curb and Gutter Removal

 

Figures

 

7040.101 Full Depth PCC Patches Less Than or Equal to15 Long

 

7040.102 Full Depth PCC Patches Greater Than 15 Long

 

7040.103 Full Depth HMA Patches

 

7040.104 Partial Depth Patches

 

7040.105 Flowable Mortar Cutoffwall

 

Section 7050 - Asphalt Stabilization

 

Part 1 - General

 

1.01 Section Includes

 

1.02 Description of Work

 

1.03 Submittals

 

1.04 Substitutions

 

1.05 Delivery, Storage, and Handling

 

1.06 Scheduling and Conflicts

 

1.07 Special Requirements

 

1.08 Measurement and Payment

 

Part 2 - Products

 

2.01 Materials

 

Part 3 - Execution

 

3.01 Equipment

 

3.02 Re-shaping Ditches

 

3.03 Prepare / Place Base Material

 

3.04 Surface Fixture Adjustment

 

3.05 Application and Mixing of Asphalt Emulsion

 

3.06 Grade and Compact Material

 

3.07 Surface Treatment

 

Section 7060 - Bituminous Seal Coat

 

Part 1 - General

 

1.01 Section Includes

 

1.02 Description of Work

 

1.03 Submittals

 

1.04 Substitutions

 

1.05 Delivery, Storage, and Handling

 

1.06 Scheduling and Conflicts

 

1.07 Special Requirements

 

1.08 Measurement and Payment

 

Part 2 - Products

 

2.01 Materials

 

Part 3 - Execution

 

3.01 Equipment

 

3.02 Surface Preparation

 

3.03 Heating Bituminous Material

 

3.04 Spreading Bituminous Material

 

3.05 Rolling

 

3.06 Two Course Seal Coats

 

3.07 Clean Up

 

Section 7070 - Emulsified Asphalt Slurry Seal

 

Part 1 - General

 

1.01 Section Includes

 

1.02 Description of Work

 

1.03 Submittals

 

1.04 Substitutions

 

1.05 Delivery, Storage, and Handling

 

1.06 Scheduling and Conflicts

 

1.07 Special Requirements

 

1.08 Measurement and Payment

 

Part 2 - Products

 

2.01 Materials

 

2.02 Composition of the Slurry Mix

 

2.03 Mix Design

 

Part 3 - Execution

 

3.01 Equipment

 

3.02 Surface Preparation

 

3.03 Applying Slurry Material

 

3.04 Slurry Leveling

 

3.05 Limitations

 

3.06 Curing and Opening to Traffic