Division 9 Table of Contents

 

Section 9010 - Seeding

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Seed

 

2.02      Seed Mixtures and Seeding Dates

 

2.03      Fertilizer

 

2.04      Sticking Agent

 

2.05      Inoculant for Legumes

 

2.06      Water

 

2.07      Mulch

 

Part 3 - Execution

 

3.01      Equipment

 

3.02      Area of Seeding

 

3.03      Finish Grading and Topsoil

 

3.04      Conventional Seeding

 

3.05      Hydraulic Seeding

 

3.06      Pneumatic Seeding

 

3.07      Watering

 

3.08      Re-seeding

 

3.09      Clean Up

 

3.10      Acceptance and Warranty

 

Section 9020 - Sodding

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Sod

 

2.02      Fertilizer

 

2.03      Stakes

 

2.04      Water

 

Part 3 - Execution

 

3.01      Preparation of Sodbed

 

3.02      Fertilizing - First Application

 

3.03      Sod Installation

 

3.04      Watering

 

3.05      Fertilizing - Second Application

 

3.06      Maintenance

 

3.07      Clean Up

 

3.08      Acceptance

 

Section 9030 - Plant Material and Planting

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Plant Materials

 

2.02      Mulch

 

2.03      Backfill Material

 

2.04      Staking Material

 

2.05      Guying Material

 

2.06      Tree Wrapping Material for Winter Protection

 

2.07      Water

 

2.08      Tree Drainage Wells

 

2.09      Herbicide

 

Part 3 - Execution

 

3.01      Allowable Planting Dates

 

3.02      Preparation

 

3.03      Location of Plants

 

3.04      Excavation of Planting Pit

 

3.05      Tree Drainage Wells

 

3.06      Planting

 

3.07      Mulching

 

3.08      Wrapping

 

3.09      Staking and Guying

 

3.10      Pruning

 

3.11      Clean Up

 

3.12      Establishment and Warranty Periods and Acceptance

 

Figures

 

9030.101           Planting Pit

 

9030.102           Tree Staking, Guying, and Wrapping

 

9030.103           Tree Drainage Well

 

Section 9040 - Erosion and Sediment Control

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Compost Blankets

 

2.02      Compost Blanket and Filter Berm Tackifier

 

2.03      Filter Material

 

2.04      Filter Sock

 

2.05      Temporary Rolled Erosion Control Products (RECP)

 

2.06      Wattles

 

2.07      Check Dams

 

2.08      Level Spreaders

 

2.09      Rip Rap

 

2.10      Temporary Pipe Slope Drains

 

2.11      Sediment Basin Outlet Structures

 

2.12      Sediment Traps

 

2.13      Silt Fence

 

2.14      Stabilized Construction Entrance

 

2.15      Dust Control

 

2.16      Erosion Control Mulch

 

2.17      Turf Reinforcement Mats (TRM)

 

2.18      Inlet Protection

 

2.19      Flow Transition Mats

 

2.20      Engineering Fabric

 

Part 3 - Execution

 

3.01      SWPPP Preparation

 

3.02      SWPPP Management

 

3.03      Erosion and Sediment Control Inspection

 

3.04      Equipment

 

3.05      Compost Blanket

 

3.06      Filter Berms

 

3.07      Filter Socks

 

3.08      Temporary Rolled Erosion Control Products (RECP)

 

3.09      Wattles

 

3.10      Check Dams

 

3.11      Temporary Earth Diversion Structures

 

3.12      Level Spreaders

 

3.13      Rip Rap

 

3.14      Temporary Pipe Slope Drains

 

3.15      Sediment Basin Outlet Structures

 

3.16      Anti-Seep Collar

 

3.17      Sediment Traps

 

3.18      Silt Fences

 

3.19      Stabilized Construction Entrance

 

3.20      Dust Control

 

3.21      Erosion Control Mulching

 

3.22      Turf Reinforcement Mats

 

3.23      Surface Roughening

 

3.24      Inlet Protection

 

3.25      Flow Transition Mats

 

3.26      Temporary Erosion Control Seeding

 

Figures

 

9040.101           Compost Blanket

 

9040.102           Filter Berm and Filter Sock

 

9040.103           Rolled Erosion Control Product (RECP) Installation on Slopes

 

9040.104           Rolled Erosion Control Product (RECP) Installation in Channel

 

9040.105           Wattle

 

9040.106           Check Dam Spacing

 

9040.107           Rock Check Dam

 

9040.108           Temporary Earth Diversion Structures

 

9040.109           Level Spreader

 

9040.110           Rip Rap for Pipe Outlet onto Flat Ground

 

9040.111           Rip Rap Apron for Pipe Outlet into Channel

 

9040.112           Temporary Pipe Slope Drain

 

9040.113           Sediment Basin without Emergency Spillway

 

9040.114           Sediment Basin with Emergency Spillway

 

9040.115           Sediment Basin Dewatering Device (Perforated Riser)

 

9040.116           Anti-Vortex Device

 

9040.117           Anti-Seep Collar

 

9040.118           Sediment Trap

 

9040.119           Silt Fence

 

9040.120           Stabilized Construction Entrance

 

Section 9050 - Gabions and Revet Mattresses

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Double Twisted Wire Baskets

 

2.02      Welded Wire Baskets

 

2.03      Gabion and Mattress Stone

 

2.04      Engineering Fabric

 

2.05      Anchor Stakes

 

2.06      Granular Subbase

 

Part 3 - Execution

 

3.01      Subgrade Preparation and Bedding

 

3.02      Engineering Fabric

 

3.03      Connections

 

3.04      Gabion Assembly and Installation

 

3.05      Revet Mattress Assembly and Installation

 

Figures

 

9050.101           Gabion Assembly

 

Section 9060 - Chain Link Fence

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Fabric

 

2.02      Posts, Rails, and Braces

 

2.03      Fittings

 

2.04      Tie Wire and Tension Wire

 

2.05      Barbed Wire Supporting Arms

 

2.06      Barbed Wire

 

2.07      Gates

 

2.08      Concrete

 

2.09      Electrical Ground

 

Part 3 - Execution

 

3.01      Chain Link Fence Installation

 

3.02      Removal of Existing Fences

 

3.03      Temporary Fence

 

Figures

 

9060.101           Chain Link Fence

 

9060.102           Chain Link Gate

 

9060.103           Post Installation Adjacent to Retaining Walls

 

Section 9070 - Landscape Retaining Walls

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

Part 3 - Execution

 

3.01      Excavation and Embankment

 

3.02      Installation

 

Figures

 

9070.101           Landscape Timber Retaining Wall

 

9070.102           Modular Block Retaining Wall

 

9070.103           Limestone Retaining Wall

 

Section 9071 - Segmental Block Retaining Walls

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

Part 3 - Execution

 

3.01      Excavation and Embankment

 

3.02      Installation

 

Section 9072 - Combined Concrete Sidewalk and Retaining Wall

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

Part 3 - Execution

 

3.01      Excavation and Embankment

 

3.02      Installation

 

3.03      Joints

 

3.04      Rustication

 

Figures

 

9072.221           Combined Retaining Wall - Sidewalk

 

Section 9080 - Concrete Steps, Handrails, and Safety Rail

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Steps

 

2.02      Handrail

 

2.03      Safety Rail

 

2.04      Finish

 

2.05      Attachment

 

Part 3 - Execution

 

3.01      Installation of Steps

 

3.02      Installation of Rail

 

3.03      Painting

 

Figures

 

9080.101           Type A Concrete Steps with Handrail

 

9080.102           Type B Concrete Steps with Handrail

 

9080.103           Safety Rail