Division 8 Table of Contents
Section 8010 - Traffic Signals
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Underground
2.02 Detection
2.03 Communications
2.04 Cabinet and Controller
2.05 Poles, Heads, and Signs
Part 3 - Execution
3.01 Underground
3.02 Detection
3.03 Communications
3.04 Cabinet and Controller
3.05 Poles, Heads, and Signs
3.06 Temporary Traffic Signal
3.07 Surface Restoration
3.08 Testing
3.09 Documentation
Figures
Figure 8010.101 Cabinet Foundation Details
Figure 8010.102 Pole Foundation Details
Figure 8010.103 Conduit and Precast Handholes
Figure 8010.104 Inductive Loop Vehicle Detectors
Figure 8010.105 Mast Arm Pole Details
Figure 8010.106 Pedestal Pole and Pedestrian Post Details
Figure 8010.107 Wood Post Span Assembly
Section 8020 - Pavement Markings
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Materials
Part 3 - Execution
3.01 Equipment
3.02 Construction