You need to upgrade your Flash Player
Download the most recent Flash plugin here.

Staff Contact List


Contact the Office of Construction

E-mail: central.construction@dot.iowa.gov

Fax: 515-239-1845


Greg Mulder, P.E.

Office Director

515-239-1843
  • Contract administration
  • Specification Committee
  • Construction Quality Management programs
  • Contract disputes
  • Construction staffing strategies
  • Training Academy
  • Construction policies and guidance

Thomas R. Jacobson, P.E.

Assistant Office Director

515-239-1453
  • Contract administration
  • Substantial change orders
  • Project engineer assignments
  • Davis-Bacon predetermined wages
  • Disadvantage Business Enterprise (DBE) requirements
  • OSHA
  • Hazardous waste
  • Demolition


Mark Bortle, P.E.

Traffic Safety Field Engineer

515-239-1587
  • Traffic control, lighting, signing, traffic signals
  • Work zone speed limits and Extra Enforcement
  • Pavement markings
  • Project work zone safety contact
  • News media and public relations
  • Temporary Barrier Rail for traffic control
  • ADA compliance
  • Automation initiatives and IP Plan development
  • ITS

Kyle A. Frame, P.E.

Foundations Field Engineer

515-239-1619
  • Pile Foundations
  • Wave Equation Analysis
  • Log of Piling Reports
  • Pile Dynamic Analyzer testing
  • Drilled Shafts
  • Spread Footings
  • Structural Walls (MSE, soil nail, tie back, noise, temporary sheet piling)
  • Cofferdams
  • Vibration Monitoring
  • Bridge Falsework
  • Soil foundation systems (geopiers, stone columns, settlement plates)

Kevin Merryman, P.E.

PCC Paving Field Engineer

515-239-1848
  • PCC paving/overlay
  • Quality Management-Concrete (QM-C)
  • Storm/sanitary sewers and intakes
  • Pavement preservation (patching, diamond grinding)
  • Products Evaluation Committee
  • Construction Survey

Jeffrey D. Schmitt, P.E.

HMA Paving Field Engineer

515-239-1013
  • HMA resurfacing/paving
  • Quality Management-Asphalt (QM-A)
  • Base Widening
  • Shoulder rumble strips
  • Thin maintenance treatments (seal coat, chip seal, micro-surfacing, slurry seal, crack filling)
  • Pavement Rehabilitation & Recycling (slab fracturing, cold in-place recycling, RAP)
  • Material Transfer Vehicles

Wayne A. Sunday, P.E.

Structures Field Engineer

515-239-1185
  • Bridges/Culverts
  • Quality Management-Structures
  • Bridge approaches
  • Guardrail
  • Structural concrete
  • Structural steel
  • Structural steel painting
  • Bolting
  • High performance concrete
  • Railroad agreements

Melissa Serio, P.E.

Earth Work Field Engineer

515-239-1280
  • Grading
  • Soil Identification
  • Soil Stability (Moisture, density, fly ash)
  • Slope Stability (Revetments, rock keys)
  • Drainage (Roadway pipes, subdrains, blankets, wick drains)
  • Erosion Control
  • Stormwater Requirements
  • Flowable Mortar
  • Subbases
  • Granular Shoulders
  • Landscaping
  • Fencing


Rhonda Pecenka

Engineering Technician Senior

515-239-1123
  • Cars 511
  • Haul Roads
  • Contract modification review
  • Performance measures
  • Construction office website
  • Project status and cost reports
  • Training materials

Janet Wasteney

FieldManager System Coordinator

641-782-2096
  • FieldManager/FieldBook 2 (FM/FB2) Support
  • FM/FB2 Software upgrades
  • Database queries
  • FM/FB2 system testing and evaluation
  • FM/FB2 training


Nancy South

Secretary I

515-239-1353
  • Processing change orders and final paperwork
  • Storm Water Notice of Intents
  • Process invoices
  • Project Scheduling data entry
  • Staff Actions
  • Personnel reports
  • Budget reports
  • Project files and plans

Nancy McMenamin

Secretary II

515-239-1352
  • Processing change orders and final paperwork
  • Storm Water Notice of Intents
  • Process invoices
  • Project Scheduling data entry
  • Staff Actions
  • Personnel reports
  • Budget reports
  • Project files and plans