53rd Street
- Improve ramp terminal along I-74
- Widen 53rd Street through interchange influnce area
- Improve ramp terminal and intersection design
- Reconstruct and improve interchange to partial cloverleaf with loop-type ramps for north and southbound entering traffic
- Improve ramp terminals along I-74
- Widen 53rd Street through interchange influence area
- Improve ramp terminal and intersection design
U.S. 6
- Improve ramp terminal along I-74.
- Widen 53rd Street through interchange influnce area
- Improve ramp terminal intersection design
- Improve ramp terminals along I-74
- Realign and reconstruct northbound exit and entrance ramps to the west
- Widen U.S. 6 through interchange influence area
- Improve ramp terminal and intersection design
Middle Road
- Improve ramp terminal along I-74.
- Improve ramp terminal along I-74.
- Improve the Middle Road and ramp terminal intersection design
- Reconstruct and improve interchange to a tight-urban diamond configuration
- Improve ramp terminal intersection design
Downtown Bettendorf
- Construct full-diamond interchange at Grant Street
- Widen Grant Street and convert to two-way
- Realign State Street under I-74 to the south
- Remove ramps to/from South at State Street
- Remove ramps to/from north at Kimberly Road
- Reconstruct and improve existing southbound entrance ramp at State Street; remove northbound exit ramp at State
- Construct northbound exit ramp and southbound entrance/exit ramp at Grant Street
- Widen Grant Street and convert to two-way
- Realign State Street under I-74 to the south
- Remove ramps to/from south at State Street
- Remove ramps to/from north at Kimberly Road
Downtown Moline
- Reconstruct and improve ramps to/from the South at Seventh Avenue; remove ramps to/from north at Seventh Avenue.
- Construct new ramps to/from north at Sixth Avenue
- Widen Sixth Avenue and convert to two-way
- Construct new north-south connector road between 6th and 7th
- Close 5th Avenue under I-74
- Reconstruct/improve ramps to/from the north at River Drive
- Reconstruct and improve ramps to/from the South at Seventh Avenue; remove ramps to/from north at Seventh
- Construct new northbound ramps at 6th Avenue and Fourth Avenue
- Widen Sixth Avenue and convert to 2-way
- Construct new north-south connector road between Sixth and Seventh
- Close Fifth Avenue under I-74
- Reconstruct/improve ramps to/from the north at River Drive
23rd Avenue
- Improve ramp terminals along I-74
- Improve ramp termiinal and intersection design
Mainline
- Reconstruct and improve I-74 maintaining the existing four basic lanes
- Widen and reconstruct I-74 roadway and bridges to six basic lanes with auxiliary lanes
- Improve alignment of I-74 in vicinity of Duck Creek
- Realign, widen and reconstruct I-74 bridges over Mississippi River