Preferred alternative — January 2005
You need to upgrade your Flash Player
Download the most recent Flash plugin here.
Download the most recent Flash plugin here.
53rd Street
- Reconstruct and improve the interchange with
loop ramps in the northwest and southeast quadrants and associated improvements along 53rd Street
U.S. 6 (Spruce Hills Drive) interchange
- Improve the interchange ramps, including shifting the existing northbound exit and entrance ramps and the ramp intersection west
of its present location
Holmes Street underpass
- Maintain the existing Holmes Street. Mississippi Boulevard underpass, but close the existing Kimberly Road underpass
Middle Road
- Improve interchange design features
Downtown Bettendorf
- Reconstruct and improve the interchange with a full-access interchange at Grant Street (U.S. 67)
- Eliminate existing ramps at State Street and at Kimberly Road
- Convert Grant Street in the vicinity of I-74 to a two-way street with three lanes in each direction
Downtown Moline
- Provide an improved full access interchange with ramp connections at 7th Avenue/19th Street and at 6th Avenue (IL 92 east bound), and a partial interchange with ramps to and from the north at River Drive.
U.S. 67 diagonal connector
- Reconstruct and improve the interchange with a full-access interchange at Grant Street (U.S. 67)
- Provide new connector roadways to route State Street traffic towards the I-74 interchange ramps at Grant Street
Mississippi River crossing
- Construct a new I-74 Mississippi River bridge along a new alignment to the east of the existing bridges
- Remove the existing bridges
- Pursue opportunities for a pedestrain bike trail along I-74 bridge
Avenue of the Cities
- Improve interchange design features
Mainline
- Reconstruct and improve I-74 providing six basic lanes with additional auxiliary lanes at select locations.
- Shift alignment of I-74 to the east near the Mississippi River